DR Congo
Tier 1 of four readiness tiers, median rank 5 of 54. Indicator values show their source and evidence grade; X means no data.
Imputed Values for T1 are missing and were filled with the cross-country median for the index; with low or high values instead the rank would be 7.0 or 2.0.
Chain of conditions
5 of 7 linksThe seven conditions a creditable removal needs. Biophysically favourable (C1 and C2 met). Binding link: C4 Field evidence. Verification index 3.47 of 5.
- C1 Rock metRock
Mafic rock mapped within 50 km of cropland, or a documented feedstock deposit - C2 Soil and climate metSoil and climate
At least 10% of cropland with topsoil pH below 5.5 - C3 Characterised feedstock not metCharacterised feedstock
A deposit with measured CaO and MgO (characterisation Tier 2 or above) - C4 Field evidence not met, binding linkField evidence (binding link)
A peer-reviewed field or pot trial with ERW rock, or a measured removal, in the country - C5 Measurement metMeasurement
Accreditation coverage and an accredited soil-chemistry laboratory at home or in a regional partner state - C6 Crediting and authorisation metCrediting and authorisation
An Article 6.4 national authority and a carbon-market policy or legal instrument in force - C7 Social licence metSocial licence
Benefit-sharing and community consent or participation provisions in force
Cropland
- 39,731km² of cropland
- 26,886km² acidic and warm-humid (favourable)
- 0km² of it within 50 km of any documented deposit
- 0km² verifiable (within 50 km of characterised rock, laboratory in reach)
- 26,886km² where early monitoring must rely on soil analyses
Soil laboratory in a regional partner state. Areas from the 1/24° grid of the integrated study.
Pathway
DR Congo is biophysically favourable and misses 2 core links (C3 and C4). Actions that would close them:
- Characterise a documented deposit
- Public reference field site
Readiness profile
Solid shape: DR Congo. Dashed: median of the 54 countries.
At a glance
7 dimensions, 16 indicators
Feedstock
Mafic rock near cropland
Measure: % of cropland within 50 km of mafic rock (GLiM vb, pb, mtam, mtgr) (linear 0 to 50%)
Basis: % cropland within 50 km of mafic rock in the full-resolution GLiM (basic volcanic, basic plutonic, amphibolite, greenstone); 25 km 9.1%, 100 km 21.0%, with intermediate volcanics 13.9%; v1 (0.5 deg GLiM) 10.0%
Source: DS12b; DS18
Mining and mine-residue footprint
Measure: mapped mining area (Maus et al. v2) (quintiles)
Basis: mapped mining area 426.2 km2, 223 polygons [renamed: mining and mine-residue footprint; polygons are dominated by metal mines]
Source: Maus et al. global mining polygons v2 (area per country table)
Soil and climate
Acidic cropland share
Weathering climate
Agronomic fit
Cropland area
Measure: cropland (log) (quintiles)
Basis: cropland 2024 (ha)
Source: FAOSTAT Land Use (RL), item Cropland, element Area
Lime-responsive crop mix
Measure: share of harvested area in lime-responsive crops (quintiles)
Basis: share of harvested area 2022-2024 mean in maize, dry beans, cassava, sugar cane, soya beans, groundnuts
Source: FAOSTAT Crops and livestock products (QCL), element Area harvested
Fertiliser use
Measure: N+P2O5+K2O per ha (quintiles)
Basis: N+P2O5+K2O kg/ha cropland, mean 2022-2024; agricultural lime not reported by FAOSTAT
Source: FAOSTAT Fertilizers by Nutrient (RFN), element Use per area of cropland
Deployment and net-removal efficiency
Road access
National logistics performance
Measure: LPI 2023 (2022 survey) (linear 1 to 5)
Basis: LPI 2022
Source: World Bank LPI via WDI LP.LPI.OVRL.XQ
Grid carbon intensity
Measure: g CO2 per kWh (linear 700 to 100)
Basis: gCO2/kWh 2024
Source: Ember Yearly Electricity Data (long format), Variable CO2 intensity
MRV capacity
Accreditation infrastructure
Measure: ILAC MRA status (rubric 0/2/3/5)
Basis: SADCAS regional MRA signatory
Source: ILAC signatory print list and members-by-category, accessed 2026-10-28
Soil laboratory network
Measure: laboratories in AFRILAB or NENALAB meetings (2022) (count: 0 to 4 as counted, 5 if 6 or more)
Basis: no laboratory listed
Source: FAO AFRILAB-IV/22/Report Annex I; GLOSOLAN member update 2025
Policy and markets
Article 6 engagement
Measure: DNA, bilateral agreements, pipeline activity (0 to 3 rescaled)
Basis: DNA=1; bilateral agreements=0; PACM activities=2; ITMOs issued=0
Source: UNEP-CCC Article 6 Pipeline global data (last updated 13 Oct 2026); UNFCCC A6.4 DNA list (as at 1 Sep 2026)
Governance quality
Measure: WGI regulatory quality and rule of law (linear -2.5 to 2.5)
Basis: WGI RQ 2025, RL 2025
Source: World Bank Worldwide Governance Indicators (API source 3) GOV_WGI_RQ.EST and GOV_WGI_RL.EST
Social licence
Tenure security Imputed
Measure: share of adults insecure about main property (Prindex) (linear 0 to 50% (inverse))
Basis: not surveyed
Source: Prindex public microdata Rounds 1-2 (20240910), mainprop_security==0, PRINDEX_WT; linear 5 at 0% to 0 at >=50%
Feedstocks
1 deposit in the register, best evidence Tier 1. Published whole-rock analyses (GEOROC) exist near cropland, so the geochemistry of local rocks is partly known (median theoretical potential 305 kg CO2 per t).
| Deposit | Material and rock | Tier | Evidence | Potential (kg CO2/t) | Contaminants | Acidic cropland within 50 km (km²) |
|---|---|---|---|---|---|---|
| DR Congo rock powder (Geoderma 2026; full text not accessed) COD-ROC | rock, unspecified | 1 | Evidence grade B | not verified | none screened | no data |
Evidence indicators
Evidence is reported separately from readiness. Scores rise with peer-reviewed studies; grade B marks peer-reviewed evidence, C grey literature only.
Feedstock characterisation (feedstock)
Rule: catalogue or >=3 peer-reviewed 5; 2: 4; 1: 3; grey only 2; none 0
Basis: 0 peer-reviewed, 0 grey characterisation record(s)
Contaminant screening (feedstock)
Rule: >=2 peer-reviewed 5; 1: 3; grey only 2; none 0
Basis: 0 peer-reviewed, 0 grey contaminant screen(s)
Field evidence with ERW-relevant rock (field)
Rule: >=3 peer-reviewed field 5; 2: 4; 1: 3; pot only 2; grey only 1; none 0
Basis: 0 peer-reviewed field, 0 peer-reviewed pot or incubation, 0 grey trial(s) with ERW-relevant rock; 0 trial(s) with other rock (not counted)
Measured CO2 removal (field)
Rule: >=2 peer-reviewed 5; 1: 4; grey only 2; none 0
Basis: 0 peer-reviewed in-country measurement(s) of CO2 removal
Social evidence (social)
Rule: >=2 peer-reviewed 5; 1: 4; grey only 2; none 0
Basis: no published public or farmer perception study of ERW found (searches of 28 Oct and 3 Nov)
Next evidence step
One peer-reviewed study in the feedstock domain would bring DR Congo to the credibility gate.
Evidence records counted
No counted evidence records.
ERW studies
No ERW field, pot or incubation study was found for this country.
Studies in the tropical evidence map
No direct study from this country is in the tropical evidence map.
Accredited laboratories
| Laboratory | Scope | Accreditation | Status | Grade |
|---|---|---|---|---|
| Société de Surveillance Minière - Kolwezi | Major-element geochemistry | SADCAS TEST-5 0103 | current | Evidence grade A |
| SGS Minerals SAS RDC, Kamoa Laboratory | Assay (precious and base metals) | SADCAS TEST-5 0087 | current | Evidence grade A |
| Alfred H Knight Laboratory, Democratic Republic of Congo | Major-element geochemistry | SADCAS TEST-5 0080 | current | Evidence grade A |
Measurement capacity
DR Congo has no current accredited soil-chemistry laboratory at home, but has regional access: accredited soil laboratories exist in Botswana, Kenya, Mauritius, South Africa and Tanzania, partner states in a regional economic community it belongs to (EAC, ECCAS, SADC).
- Yes Accreditation coverage (SADCAS regional MRA signatory)
- No Current accredited soil-chemistry laboratory
- Yes Current accredited major-element laboratory
- No Isometric in-country laboratory route
Article 6 and carbon markets
| Item | Status |
|---|---|
| Designated national authority (Article 6.4) | Yes |
| Host-Party participation requirements published | Yes |
| Authorising body listed (implementation report) | No |
| CARP initial report submitted | Yes |
| Bilateral Article 6.2 agreements | 0 |
| PACM activities in the pipeline | 2 |
| National carbon-market framework | Level 3 of 3: Act or regulation Ordonnance-loi No. 26/016 on the carbon market regime (ARMCA, national registry), promulgated |
| Article 6 institutional arrangements (P6) | 3.5 of 5 Proposed scale |
What-if analysis
IllustrativeMove a dimension score to see how the readiness index and rank would respond, with all other countries held at their published values. This is a sensitivity tool, not a forecast.
Tip: the left and right arrow keys move to the previous and next country.
Social licence in carbon-market law
Ordonnance-loi 26/016 (2026) addresses benefit sharing for local communities and Indigenous peoples; mechanism not verified
source 1 source 2
Legal provisions are not evidence that communities accept a project. All countries