Internationally transferred mitigation outcomes under Article 6 of the Paris Agreement require authorisation by the host country. This page shows each country's Article 6 institutions and national carbon-market framework, how engagement relates to biophysical suitability, and what the laws in force say about benefit sharing, consent and grievance.
National carbon-market frameworks
Reading the indicators
Institutional arrangements (P6): one point each for a designated national authority, an authorising body listed in the 2026 implementation report, published host-Party participation requirements and a CARP initial report, plus one point for a registry in place (half for one in progress). Proposed scale
Framework level: 0 none found, 1 draft or strategy (8 countries), 2 policy or guidelines (4), 3 act or regulation (18); 24 countries have none that could be found.
Article 6 engagement (P1): designated authority, bilateral agreements and pipeline activities, scaled 0 to 5.
None of the voluntary ERW crediting protocols reviewed requires host-country authorisation; the Article 6.4 removals standard does.
All countries
| Country | DNA | Requirements | Authorising body | CARP | Bilateral | PACM | Framework | Instrument | P6 |
|---|---|---|---|---|---|---|---|---|---|
| Algeria | No | No | No | No | 0 | 0 | 0 | None identified | 0 |
| Angola | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| Benin | Yes | Yes | No | No | 1 | 0 | 3 | Decrees 2022-698 (registration of carbon projects) and 2022-699 (AEPC) | 2 |
| Botswana | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| Burkina Faso | Yes | Yes | No | No | 0 | 2 | 1 | Draft law on carbon initiatives (24 articles) | 2 |
| Burundi | Yes | Yes | Yes | No | 0 | 1 | 1 | Article 6 regulatory framework validated, not gazetted | 3 |
| Cabo Verde | Yes | Yes | No | No | 0 | 1 | 0 | None identified | 2 |
| Cameroon | Yes | Yes | No | No | 0 | 2 | 0 | None identified (World Bank forest-sector roadmap only) | 2 |
| Central African Republic | Yes | No | No | No | 0 | 0 | 3 | Decree No. 25.175 fixing rules for carbon-market mechanisms | 1 |
| Chad | Yes | Yes | No | No | 0 | 0 | 0 | None identified (MoU with a private platform, Jun 2026) | 2 |
| Comoros | No | No | No | No | 0 | 0 | 0 | None identified | 0 |
| Côte d’Ivoire | Yes | Yes | Yes | No | 0 | 1 | 3 | Decree 2024-658 creating Bureau du Marche Carbone and national registry; Manual of Procedures 2025 | 4 |
| DR Congo | Yes | Yes | No | Yes | 0 | 2 | 3 | Ordonnance-loi No. 26/016 on the carbon market regime (ARMCA, national registry) | 3.5 |
| Djibouti | Yes | No | No | No | 0 | 0 | 3 | Decree 2023-074/PRE on carbon contribution and compensation mechanism and national registry | 1 |
| Egypt | Yes | Yes | No | No | 0 | 2 | 3 | PM Decree 4664/2022 (carbon credits as financial instruments) and FRA Decree 57/2023 | 2 |
| Equatorial Guinea | No | No | No | No | 0 | 0 | 0 | None identified (World Bank roadmap) | 0 |
| Eritrea | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| Eswatini | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| Ethiopia | Yes | Yes | Yes | No | 2 | 5 | 3 | Carbon Market Proclamation No. 1436/2026; National Carbon Market Strategy 2025-2035 | 3 |
| Gabon | Yes | Yes | No | No | 1 | 1 | 3 | Ordonnance 019/2021 on climate change (national carbon market, registry, state 20% share), ratified by Law 018/2022 | 2 |
| Ghana | Yes | Yes | Yes | Yes | 5 | 2 | 3 | Environmental Protection Act 2025 (Act 1124) ss.148-159; Framework on International Carbon Markets 2022 | 5 |
| Guinea | Yes | Yes | Yes | No | 0 | 0 | 1 | Sector carbon pricing instrument (mining) under development | 3 |
| Guinea-Bissau | No | No | No | No | 0 | 0 | 0 | None identified | 0 |
| Kenya | Yes | Yes | Yes | No | 5 | 17 | 3 | Climate Change (Amendment) Act 2023; Climate Change (Carbon Markets) Regulations 2024 (LN 84/2024) | 4 |
| Lesotho | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| Liberia | Yes | Yes | No | No | 0 | 0 | 2 | Executive Order No. 155 establishing Carbon Markets Authority; National Carbon Market Policy (Aug 2026); CMA Act draft | 2 |
| Libya | No | No | No | No | 0 | 0 | 0 | None identified | 0 |
| Madagascar | Yes | Yes | Yes | Yes | 0 | 4 | 3 | Decree 2025-626 (forest carbon market access); Arrete 14683/2025 (ANDMC) | 4 |
| Malawi | Yes | Yes | Yes | Yes | 2 | 5 | 2 | Carbon Market Framework | 4.5 |
| Mali | Yes | Yes | No | Yes | 0 | 2 | 1 | Carbon market governance framework under consultation (AEDD) | 3 |
| Mauritania | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| Mauritius | Yes | Yes | No | No | 0 | 4 | 0 | Carbon market framework in preparation | 2 |
| Morocco | Yes | Yes | Yes | No | 3 | 1 | 1 | Draft law 62.25 on carbon markets | 3 |
| Mozambique | Yes | Yes | No | No | 0 | 1 | 1 | Draft carbon market regulation | 2 |
| Namibia | Yes | No | No | No | 0 | 0 | 1 | National Framework on International Carbon Markets | 1 |
| Niger | Yes | Yes | Yes | No | 0 | 0 | 0 | None identified beyond Article 6.4 host participation requirements | 3 |
| Nigeria | Yes | Yes | Yes | No | 0 | 4 | 2 | National Carbon Market Framework / Carbon Market Activation Policy (NCCC) | 3 |
| Republic of the Congo | Yes | No | No | No | 0 | 0 | 0 | None identified (World Bank forest-sector roadmap only) | 1 |
| Rwanda | Yes | Yes | Yes | Yes | 3 | 2 | 3 | National Carbon Market Framework (2023); Ministerial Instructions No 001/MoE/26 on fees (13 Jan 2026) | 4.5 |
| Senegal | Yes | Yes | Yes | No | 4 | 7 | 2 | National Article 6 Strategy (validated 2023); draft decree on carbon markets | 3 |
| Seychelles | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| Sierra Leone | Yes | No | No | Yes | 0 | 0 | 0 | Framework under development | 2 |
| Somalia | Yes | Yes | No | No | 0 | 0 | 0 | None identified | 2 |
| South Africa | Yes | Yes | No | No | 0 | 17 | 3 | Carbon Tax Act 2019 and Carbon Offsets Regulations; draft Article 6 Framework (2024) | 2 |
| South Sudan | No | No | No | No | 0 | 0 | 0 | None identified | 0 |
| Sudan | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| São Tomé and Príncipe | Yes | No | No | No | 0 | 0 | 0 | None identified | 1 |
| Tanzania | Yes | Yes | Yes | Yes | 2 | 0 | 3 | Environmental Management (Carbon Trading) Regulations GN 636/2022, amended GN 721/2023 | 4.5 |
| The Gambia | Yes | Yes | No | Yes | 0 | 0 | 1 | Draft Carbon Trading Bill validated by MECCNAR | 3 |
| Togo | Yes | Yes | No | No | 0 | 0 | 3 | Decree 2023-034/PR on carbon mechanisms; Operational Manual Article 6.2 | 2 |
| Tunisia | Yes | No | Yes | Yes | 3 | 0 | 0 | Article 6 regulations planned | 3.5 |
| Uganda | Yes | Yes | Yes | No | 0 | 15 | 3 | National Climate Change Act 2021; Climate Change (Mechanisms) Regulations SI 9/2025 | 3 |
| Zambia | Yes | Yes | Yes | No | 4 | 3 | 3 | Green Economy and Climate Change Act No. 18 of 2024; Carbon Market Regulations SI 5 of 2026 | 4 |
| Zimbabwe | Yes | Yes | Yes | Yes | 0 | 0 | 3 | Carbon Trading (General) Regulations SI 48 of 2025 | 5 |
Sources: UNFCCC Article 6.4 DNA list; UNEP Copenhagen Climate Centre Article 6 Pipeline; UNFCCC CARP; IGES Article 6 Implementation Status Report 2026; national gazettes and FAOLEX. Snapshot 3 November 2026.
Engagement and biophysical suitability
Spearman correlations between Article 6 engagement (P1) and the biophysical sub-index, its dimensions and indicators, with bootstrap 95% intervals (5,000 resamples). The association with the sub-index is positive but carried by cropland area, fertiliser use and mining activity; it is close to zero for acidic cropland, mafic rock near cropland and weathering climate.
With the indicator-level biophysical score instead of the sub-index the correlation is weaker, so the size of the association depends on how suitability is summarised.
Verification capacity. The integrated study combines measurement and crediting into a verification index (0 to 5). It correlates with the biophysical sub-index (Spearman ρ = 0.38; 95% CI 0.14 to 0.59), an association carried by agricultural scale, but not with the soil and climate conditions that favour ERW (ρ = −0.04). Crediting institutions are more widespread than measurement capacity: 48 countries have an Article 6.4 authority, against 10 with an accredited soil laboratory at home.
Social licence in carbon-market law
Enhanced rock weathering would take place on farmland, often smallholder land. The carbon-market laws in force were coded for benefit sharing with communities, community consent and grievance mechanisms. Legal provisions are not evidence that communities accept a project.
What was coded
For each of the 22 instruments, provisions were coded from the instrument and two comparative legal reviews: benefit sharing 2 (binding rule, defined share or mandatory agreement), 1 (general provision) or 0 (none identified); consent 2 (explicit consent), 1 (consultation or participation) or 0; and a grievance or dispute mechanism, 1 or 0. Where the sources consulted did not establish a provision it is shown as not determinable, which is not the same as absent: this applies to benefit sharing in 9 instruments, consent in 12 and grievance mechanisms in 14.
Only 6 countries (DR Congo, Ethiopia, Kenya, Uganda, Zambia and Zimbabwe) have both benefit-sharing and consent or participation provisions in force, the condition for chain link C7. Binding benefit sharing is in force in Ethiopia, Kenya, Tanzania, Zambia and Zimbabwe; explicit consent is required in Ethiopia and DR Congo.
What is not known
Provisions by country
Basis and sources
Benefit sharing: Not determinable from sources consulted (Decrees 2022-698/699 (project registration; AEPC))
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: Not determinable from sources consulted (Decree 25.175 (2025))
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: Not determinable from sources consulted (Decree 2024-658 (FCPF programme has a benefit-sharing plan, not law))
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: Ordonnance-loi 26/016 (2026) addresses benefit sharing for local communities and Indigenous peoples; mechanism not verified
Consent: FPIC governed by Article 39 of the carbon law (replacing Ministerial Order 026/2017)
Grievance: Not determinable from sources consulted
source 1; source 2 Accessed 2026-11-13.
Basis and sources
Benefit sharing: Not determinable from sources consulted (Decree 2023-074/PRE)
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: Not determinable from sources consulted (PM Decree 4664/2022; FRA Decree 57/2023)
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: Benefit-sharing plan required (Forest Carbon Trading Directive 1122/2025); at least 80% of net proceeds to forest owners reported
Consent: Benefit-sharing plan prepared with beneficiaries' consent; FPIC expected of private entities where relevant
Grievance: Not determinable from sources consulted
source 1; source 2 Accessed 2026-11-13.
Basis and sources
Benefit sharing: Not determinable from sources consulted (Ordonnance 019/2021 (state 20% share; community provisions not identified))
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: Act 1124 requires projects to show how benefits are shared with host communities; no share set; regulations pending
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
source 1; Shah et al. 2024 (CAP-A/FSD Africa) https://fsdafrica.org/wp-content/uploads/2025/05/CAP-A-Benefit-Sharing-Report-23.08.24_FINAL.pdf Accessed 2026-11-13.
Basis and sources
Benefit sharing: At least 40% of aggregate earnings to communities for land-based projects on community or public land, 25% otherwise; Community Development Agreement (Climate Change (Carbon Markets) Regulations 2024, LN 84/2024)
Consent: Community Development Agreement and stakeholder engagement required; no explicit FPIC clause found
Grievance: Dispute resolution under Climate Change Act s23H; grievance subcommittee in Community Development Agreements
Inglesi-Lotz et al. 2025 (Natural Justice/CEJA review) https://naturaljustice.org/wp-content/uploads/2025/07/CARBON-MARKETS-REPORT_Submitted_Natural-Justice.pdf; source 2; Shah et al. 2024 (CAP-A/FSD Africa) https://fsdafrica.org/wp-content/uploads/2025/05/CAP-A-Benefit-Sharing-Report-23.08.24_FINAL.pdf Accessed 2026-11-13.
Basis and sources
Benefit sharing: Forestry law: communities receive part of area-based fees; draft carbon policy proposes 50% to communities (contested)
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Shah et al. 2024 (CAP-A/FSD Africa) https://fsdafrica.org/wp-content/uploads/2025/05/CAP-A-Benefit-Sharing-Report-23.08.24_FINAL.pdf; source 2 Accessed 2026-11-13.
Basis and sources
Benefit sharing: Not determinable from sources consulted (Decree 2025-626 (forest carbon market access))
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: Carbon Market Framework 2025 sets shares of proceeds for protected areas (community share reported as 5%); formula contested
Consent: Standalone law with consent rules pending
Grievance: Not determinable from sources consulted
source 1; source 2 Accessed 2026-11-13.
Basis and sources
Benefit sharing: No benefit-sharing rule identified; voluntary market governed by independent standards
Consent: No clear public-participation regulation
Grievance: No dispute-resolution framework identified
Inglesi-Lotz et al. 2025 (Natural Justice/CEJA review) https://naturaljustice.org/wp-content/uploads/2025/07/CARBON-MARKETS-REPORT_Submitted_Natural-Justice.pdf Accessed 2026-11-13.
Basis and sources
Benefit sharing: National Carbon Market Framework 2023 silent on benefit sharing
Consent: Framework does not set out community inclusion
Grievance: Framework sets a procedure for resolving conflicts in carbon trading
Inglesi-Lotz et al. 2025 (Natural Justice/CEJA review) https://naturaljustice.org/wp-content/uploads/2025/07/CARBON-MARKETS-REPORT_Submitted_Natural-Justice.pdf Accessed 2026-11-13.
Basis and sources
Benefit sharing: Not determinable from sources consulted (National Article 6 Strategy; draft decree)
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: No carbon-specific benefit-sharing rule identified
Consent: Consultation through the environmental impact assessment process (NEMA s24); FPIC acknowledged, not mandated for carbon projects
Grievance: Not identified for carbon projects
Inglesi-Lotz et al. 2025 (Natural Justice/CEJA review) https://naturaljustice.org/wp-content/uploads/2025/07/CARBON-MARKETS-REPORT_Submitted_Natural-Justice.pdf Accessed 2026-11-13.
Basis and sources
Benefit sharing: Mandatory benefit sharing: revenue shared with government including village government and community activities (Carbon Trading Regulations 2022, amended 2023)
Consent: No community consent or participation requirement identified by the review
Grievance: No dispute-resolution framework identified by the review
Inglesi-Lotz et al. 2025 (Natural Justice/CEJA review) https://naturaljustice.org/wp-content/uploads/2025/07/CARBON-MARKETS-REPORT_Submitted_Natural-Justice.pdf; Shah et al. 2024 (CAP-A/FSD Africa) https://fsdafrica.org/wp-content/uploads/2025/05/CAP-A-Benefit-Sharing-Report-23.08.24_FINAL.pdf Accessed 2026-11-13.
Basis and sources
Benefit sharing: Not determinable from sources consulted (Decree 2023-034/PR)
Consent: Not determinable from sources consulted
Grievance: Not determinable from sources consulted
Instrument listed in the measurement and Article 6 study national_frameworks.csv; text not checked for these provisions Accessed 2026-11-13.
Basis and sources
Benefit sharing: Climate Change Act 2021 allows proponents to benefit subject to approval; no split identified (SI 9 of 2025 not checked in full)
Consent: Act acknowledges indigenous and marginalised communities
Grievance: Recourse to the High Court for rights threatened by mitigation actions
Inglesi-Lotz et al. 2025 (Natural Justice/CEJA review) https://naturaljustice.org/wp-content/uploads/2025/07/CARBON-MARKETS-REPORT_Submitted_Natural-Justice.pdf; Shah et al. 2024 (CAP-A/FSD Africa) https://fsdafrica.org/wp-content/uploads/2025/05/CAP-A-Benefit-Sharing-Report-23.08.24_FINAL.pdf Accessed 2026-11-13.
Basis and sources
Benefit sharing: Community development and benefit-sharing agreements required (Carbon Market Regulations SI 5 of 2026, s22); benefit-sharing plans required for permits under SI 66 of 2021
Consent: Community participation encouraged; FPIC not confirmed in SI 5 of 2026
Grievance: Grievance redress mechanism required in project design; Director mediates disputes (SI 66 of 2021)
Inglesi-Lotz et al. 2025 (Natural Justice/CEJA review) https://naturaljustice.org/wp-content/uploads/2025/07/CARBON-MARKETS-REPORT_Submitted_Natural-Justice.pdf; source 2; source 3 Accessed 2026-11-13.
Basis and sources
Benefit sharing: Community revenue sharing mandated (Carbon Trading (General) Regulations SI 48 of 2025; earlier SI 150 of 2023)
Consent: Local consultation and public participation required; depth not specified
Grievance: Appeal to the minister and the administrative court (SI 150 of 2023)
Inglesi-Lotz et al. 2025 (Natural Justice/CEJA review) https://naturaljustice.org/wp-content/uploads/2025/07/CARBON-MARKETS-REPORT_Submitted_Natural-Justice.pdf; source 2; source 3 Accessed 2026-11-13.
Social licence score: the readiness dimension built from tenure security (Prindex). C7: both provisions in force. Coded 13 November 2026.
32 countries without a carbon-market policy or legal instrument in force
Algeria, Angola, Botswana, Burkina Faso, Burundi, Cabo Verde, Cameroon, Chad, Comoros, Equatorial Guinea, Eritrea, Eswatini, Guinea, Guinea-Bissau, Lesotho, Libya, Mali, Mauritania, Mauritius, Morocco, Mozambique, Namibia, Niger, Republic of the Congo, Seychelles, Sierra Leone, Somalia, South Sudan, Sudan, São Tomé and Príncipe, The Gambia and Tunisia.